CNIM China Delivers Landmark Nuclear Power Plant Drawbridge

At the close of 2023, we announced a landmark order to manufacture a critical component for an international nuclear power project. We made a promise of excellence and partnership. Today, we are proud to announce we have delivered.
CNIM China has successfully completed the manufacturing and factory acceptance testing of a custom-engineered automated drawbridge, marking a major milestone for our team and our client. This achievement is a direct result of precision engineering, robust manufacturing, and seamless international collaboration.

Engineering a 210-Ton Challenge
This was no ordinary bridge. The project’s core challenge was to design and build a structure capable of supporting a210-tonmoving trolley while ensuring flawless, long-term automated lifting and lowering.
Executing this demanded a meticulous focus on every detail—from the integrity of each weld to the precision of the control systems. For our team, this project was a test of our technical expertise and our unwavering commitment to the safety and quality standards required in the critical nuclear energy sector.

The Acclaim: The Highest Praise from Our Client
The success of this project was made possible by the outstanding collaboration of all partners. Upon its successful completion, the client’s Technical Manager, shared his excitement on LinkedIn, offering the best possible commendation for our work:
“A great team can lead you to achieve great things! What an amazing challenge to build a drawbridge supporting a 210 tons trolley!! Thanks for the challenge from our dear customer. Thanks for the technical support. Thanks for the good manufacturing CNIM China. Great things can only be achieved by a great team with people working in the same way to reach the same goal! Thanks all of you.”
Customer’s praise not only recognizes CNIM China’s outstanding manufacturing work but also highlights the true core of the project’s success: teamwork. From the client to the technical support, and to our own international CNIM teams, it was this seamless collaboration and shared goal that turned an “amazing challenge” into an “amazing achievement.”
The Future: Forging Trust Through Performance
From the “perfect finale order” of 2023 to today’s “excellent delivery,” CNIM China has once again demonstrated through action that choosing CNIM is choosing excellence and trust.
This drawbridge, a product of immense skill and dedication, will soon travel across the ocean to play a crucial role in a world-class clean energy project. It is not only a symbol of CNIM China’s manufacturing prowess but also a beautiful new chapter we have written with our global partners in our shared mission to create a greener, more brilliant future.
Thank you to our client for their trust and to all our partners for their support. Every successful delivery is the prelude to the next great collaboration.
CNIM China: Building trust through strength, creating the future through collaboration.